3rd party opportunity source – a general opportunity provider, eg a WWV broadcast receiver, mobile phone energy watch, or internet access, are installed inside the case and the control either listens for periodic broadcast energy posts or sporadically initiates an ask for a period posting from an occasion machine.
Actuated Control Procedure
- Each level provides a predetermined minimal green period to present starting times for standing up cars.
- The environmentally friendly period stretches for every single further vehicle actuation after the lowest environmentally friendly interval have timed out, provided that a gap in site visitors higher than the current unit expansion setting does not happen. Continue reading